- Road design

Year
Client
Project
Short description of the contract
2008/
2009
Roads Directorate, Herzegovina-Neretva Canton
Supervision of the reconstruction and modernisation of a regional road

Supervision of the reconstruction and modernisation of the regional road R-418b, Prozor-Konjic, section: Dobroša-Glibe, length: 3.0 km

2008
Roads Directorate, Herzegovina-Neretva Canton
Regional road improvement project

Improvement project for regional road R-427, Stolac-Berkovići, length: 4.5 km, including a project for the improvement of an earth deposit slope, length: 500 m

2007/
2008
Roads Directorate, Herzegovina-Neretva Canton
Regional road reconstruction and modernisation project

Preliminary and main projects for the reconstruction of the regional road R-418b, Prozor-Konjic, section: Milaševica-Herska Krivina, length: 22 km

2007
Roads Directorate, Federation of Bosnia and Herzegovina, Sarajevo
Supervision of the improvement of roadbed settlement
Supervision of the improvement of roadbed settlement on the road M-17 near Jablanica
2006/
2007
Roads Directorate, Herzegovina-Neretva Canton
Drawing up a study of road structure improvement
Study of road structure improvement on section
R-437, Ostrožac-Fojnica, length: 1.7 km
2006
Roads Directorate, Herzegovina-Neretva Canton
Regional road reconstruction and modernisation project
Preliminary and main projects for the reconstruction of the regional road R-418b, Prozor-Koniic, section Kalovljakova luka-
Milaševica, length: 7.08 km
2006
Jablanica Municipality
Local road reconstruction project
Main project for the reconstruction of the local road Ostrožac-Brgulići, length: 900 m
2006
Jablanica Municipality
Local road landslide improvement project
Main project for the improvement of a section of the local road Ostrožac-Kućara, length: 35 m
2005/
2006
Roads Directorate, Herzegovina-Neretva Canton
Regional road reconstruction project
Preliminary and main projects for the reconstruction of the regional road R-437, Ostrožac-Dusina, section: Kragulja-Ljeskovik, length: 10.3 km
2005
BH Telecom d.d.  Branch Office Mostar
Main project for road improvement
Main project for the improvement of the road Jasenjani-RRS Velika Vidova, length: 15.0 km
2004/
2005
Brčko District Government, Bosnia and Herzegovina
Stability analysis of the slope beneath the Azizija Mosque
Main project for landslide improvement as part of the project for the repair of the Azizija Mosque in Brezovo Polje, Brčko District, BiH: machine drilling of boreholes, geotechnical control of drilling, drill core mapping, sampling and laboratory testing, calculation of soil parameters, calculation of stability by profiles, a study including conclusions and recommendations. Slope stability was proven. In order to ensure additional safety, a shallow drainage system was planned and subsequently designed.
2004/
2005
Neue Landesmesse GmbH & Co. KG Stuttgart
Spiral ramps structure for a public garage
Detailed design of a structure of two double spiral ramps (entrance and exit ramps) next to the public garage at the new fair in Stuttgart – in cooperation with IBA Ammann Albstadt
2004
Konjic Municipality
The Old Bridge in Konjic
Plan of investigative works, investigative works and preliminary static analysis of the bridge at the main project level – service provided in cooperation with the Faculty of Civil Engineering in Mostar
2004
Roads Directorate, Herzegovina-Neretva Canton
Bridge no. 3 on the section Parsovići – Kragulje
Inspection of the main reconstruction project and investigation of the load bearing capacity of the reconstructed bridge – service provided in cooperation with the Faculty of Civil Engineering in Mostar
2004
Roads Directorate, Herzegovina-Neretva Canton
Bridge on the road Butrović Polje – Fojnica
Inspection of the main reconstruction project and investigation of the load bearing capacity of the reconstructed bridge – service provided in cooperation with the Faculty of Civil Engineering in Mostar
2003/
2004
JP Vodovod Mostar
Water supply system for the Opine settlement in Mostar
Revision of the main project of a water supply system with a pumping station, a double-chamber tank with the capacity of 1000 m³ and a pipeline
2002/
2003
State of Baden-Württemberg
Three bridges across the eastern access ramp of K 6900, Baden-Württemberg
Main project for two bridges (next to each other) on highway B27, with a 27 m span – in cooperation with IBA Ammann Albstadt
2002/
2003
Lidl & Schwarz Stiftung & Co. KG Neckarsulm
Spiral ramps structure for a public garage in Tuebingen
Main project for two ramps (entrance and exit ramps) next to a public garage. Structural design using a 3D finite elements method, formwork and reinforcement plans – in cooperation with IBA Ammann Albstad
2002
Roads Directorate, Herzegovina-Neretva Canton
Bridge over the Seončica River in Buturović Polje
Inspection of the main reconstruction project and investigation of the load bearing capacity of the reconstructed bridge – service provided in cooperation with the Faculty of Civil Engineering in Mostar